Stakes identifying the boundaries of the new wing.
New Wing Construction Progress
Construction of the new wing is scheduled to be completed by the end of December, 2020. Follow the progress and watch our new wing come to life!
July 2020
July 2020
The preparation of the site begins.
July 2020
The foundation block for the new wing.
July 2020
Drain pipes for the new wing.
August 2020
Preparing the foundation for concrete to be poured.
August 2020
The concrete foundation for the new wing.
August 2020
The framing for one of the side walls.
August 2020
The interior wall frames for one of the classrooms in the new wing.
August 2020
The framing for the exterior walls and most of the interior walls is complete.
August 2020
The truss work is almost complete!
August 2020
The first layer of the roof is installed. The new wing is starting to take shape!
September 2020
The drywall work has begun!
October 2020
The tilework on the walls of the new restrooms is complete.
October 2020
The drywall work and installation of the sprinkler system is almost complete.
October 2020
The overhang over the back entrance is installed.
October 2020
The walls of the classrooms and offices are painted.
October 2020
The flooring throughout the new wing is in the process of being laid.
October 2020
The opening in the main hallway of the new wing. Windows flank either side, close to the roofline, letting in lots of sunshine.
October 2020
The windows have arrived!
October 2020
A classroom is nearing completion.
October 2020
The exterior heating and cooling units are placed and connected...just in time for chilly temperatures.
November 2020
Interior office windows with the final trim and a nice color of blue on the walls.
November 2020
The siding and stone work are near completion.